Skip to content

Solar Cost

Gross and net cost after ITC.

Inputs

Inputs and assumptions

DC kW.

2.2-3.6 typical.

Federal ITC.

Result

Gross cost
—
Net after credit
—

What to check

  • System size and site sun hours
  • Installer quote

Related calculators

Screening tool. Verify tariff, metering, NEC 690 and installer quotes.

Saved calculations

Keep the assumptions with the result.

Save this calculation to return to the inputs, result, and report anytime.

Sign in or create an account to save this calculation.